Peru High-Rise Passenger Elevator Manufacturing

Table of Contents

We worked with our client in Peru to provide four 14-floor station high-speed passenger elevators. To ensure energy efficiency and stability, we chose permanent magnet gearless traction machines, which save 40% more energy compared to traditional traction machines.

Project Overview

Client: Peru
Property: 14-floor station high-speed passenger elevator project, 2.5M/S
Scope and Investment: Full elevator system provided, including design, manufacturing, installation, and after-sales service
Timeline: Project delivery expected in 1 month

Our Design Plan

At the start of the project, we communicated closely with the client to fully assess their needs and the environmental conditions. We equipped the elevator system with advanced permanent magnet gearless traction machines, and paired them with Mornac motors to improve floor accuracy and ensure a smoother, more comfortable ride for passengers.

Technical and Design Highlights

  • Energy Efficient: The permanent magnet gearless traction machine saves 40% more energy than traditional machines, making the system more efficient, stable, and reducing long-term energy consumption.

  • High-speed Passenger Elevators: The elevator is designed to move at a speed of 2.5M/S, providing an efficient ride, perfect for high-rise buildings.

  • Modular System: The elevators use a modular design, making installation and future maintenance easier.

  • Environmental Adaptability: The elevator system is specially customized for Peru’s climate and environment, ensuring long-lasting, smooth operation.

Project Highlights

  • The elevator system is energy-efficient and environmentally friendly, reducing the client’s electricity costs and increasing the building’s energy efficiency.

  • We offered flexible options, including 2-floor and 3-floor station machine-room-less elevators, giving the client the best choices based on their needs.

  • The project was completed smoothly on schedule, with precise elevator installation and adjustment. The client was extremely satisfied with the final results.

Project Outcome

After 1 month of manufacturing and a few weeks of installation, the elevator system was successfully delivered and is now in use. The client is very happy with the elevator’s performance and energy-saving features. The use of permanent magnet gearless traction machines not only made the ride smoother but also significantly reduced operating costs.

Planning to Install or Upgrade an Elevator?

If you’re considering installing a new elevator for your building or upgrading your current system, we can provide a customized solution. Whether it’s energy savings, speed, or passenger comfort, we can offer the best elevator system for your project.

Contact us now to discuss how we can provide the most suitable elevator solution for your building!